Manufacturing web design for buyers, engineers and distributors

A buyer, a design engineer or a distributor comes to your website to check a part number, download a datasheet or ask for a price. We build manufacturers’ websites that answer those requests without an email to your sales office: company and range pages and a request for quote in the base price, the searchable catalogue as an optional module.

Updated

From

£8,000 ex VAT

Timeline
6 to 10 weeks
Pricing
Fixed price per stage
A sample screen, for illustration. The companies and data are made up.
WebsiteCatalogueDistributorsQuotesWebsiteCatalogueDistributorsQuotes

Your website is not doing its job if

  • Customers email to ask for datasheets and drawings that already exist.
  • An overseas distributor finds neither your products in their language nor the person to contact in their country.
  • A prospect’s procurement team asks for certificates and company details before approving you as a supplier, and none of it is online.
  • You come back from a trade show with contacts, and no page follows up what you showed there.
  • You are short of engineers and operators, and the careers page says nothing about the shop floor or the jobs.

What a manufacturer’s website contains

  • Optional

    A catalogue with depth

    Families, ranges, part numbers and variants, with search by part number and technical filters. The data comes from a spreadsheet or an ERP export; if you are weighing up a PIM, read the PIM guide.

  • Datasheets and CAD files (with the catalogue)

    Every part number carries its current documents: datasheet, manual, certificate, 2D or 3D file.

  • Request for quote

    From the product page, with the part number, the quantity and the application. The request reaches the area sales manager or the CRM.

  • Optional

    Distributor locator

    A map and a search by country or postcode, kept current from a list your own team edits.

  • Optional

    Export languages

    A full version for each market, catalogue included, with its own URLs. Not a one-page summary in German.

  • Credentials, recruitment, trade shows

    Pages on plant and capabilities, accreditations and sectors served; current vacancies; a landing page for each show.

Example: a German buyer looks for a part

A typical journey on a site with the catalogue, language and distributor modules, to illustrate. The company and the situations are fictional.

  1. 1

    They type a competitor’s part number into Google and land on the page for the equivalent product, in German.

  2. 2

    They filter the range by diameter and pressure rating, then download the datasheet and the 3D file for their design office.

  3. 3

    They open the accreditations page and collect the certificates their procurement team requires.

  4. 4

    They send a request for quote for 500 units. The part number and quantity reach the export sales manager.

  5. 5

    For small quantities, the site points them to the distributor for their region.

How the project runs

  1. Audit

    Interviews with sales, the sales office and the design office; inventory of the site, the product data and the documents.

    1 to 2 weeks
  2. Specification

    Site map, mock-ups of the page types, catalogue data model, redirect plan, price fixed.

    1 to 2 weeks
  3. Build

    A delivery every two weeks on a test environment, starting with one product family.

    3 to 5 weeks
  4. Launch

    Go-live, old URLs redirected, training for whoever will look after the site. One month of fixes against the specification is included.

    1 week, then a month of fixes

Durations to scale, using the longest stated

What the price covers

The starting price is for a manufacturer’s website in one language: company pages, product ranges, request for quote, careers, an editing tool and redirects from the old URLs. The catalogue, the distributor map and extra languages are optional modules. The price includes the specification; the audit is priced separately. The final price is fixed after the specification.

Estimate my projectSee pricing

Manufacturer’s website: structure, pages, RFQ, editing tool
from £8,000 ex VAT
Product catalogue, fed from a spreadsheet or an ERP export
from £7,000 ex VAT
Distributor map and search
from £1,300 ex VAT
Audit and roadmap, deducted from the first project we build for you
£1,650 ex VAT
Maintenance
from £390 ex VAT a month

Payment, for each stage

30%
on order
70%
on accepted delivery

Manufacturing company website design: what it must do beyond a brochure

A brochure site presents the company. A manufacturer’s website serves people at work: they have a part number in mind, a specification to meet, a supplier to get approved. Most would rather not have to ask: in a Gartner survey of 632 B2B buyers, 61% preferred a buying experience with no sales rep (Gartner, 2025). What they cannot find on your site, they ask for by email or look for elsewhere.

VisitorWhat they come to doWhat the site must offer
BuyerCompare, ask for a price, check you can be approved as a supplier.Request for quote on the product page, accreditations, company information.
Design engineerCheck specifications, drop your product into a drawing.Technical filters, datasheets, CAD files.
DistributorFind a part number, a document, a contact.Catalogue in their language, a map of the network, access to a customer portal.
Maintenance engineerIdentify a spare part, read a manual.Search by machine or part number, manuals to download.
Job applicantFind out what you make, where, and what the work is like.Current vacancies, photos of the shop floor, real job descriptions.

Website design for manufacturers: a checklist to run on your own site

Galleries of manufacturing website design show screenshots, not whether a buyer can do their job on the site. This is the checklist to use; run it on your own site in half an hour.

FeatureWhy buyers need itHow to tell if yours has it
Search by part numberThey arrive with a part number, yours or a competitor’s.Type five part numbers into the search. How many return the right page?
Technical filtersThey choose on specifications, not on a range name.Can you narrow a family down to ten products in three clicks?
Current datasheetsThey have to attach one to their own file.Open ten at random: same revision as the one the design office holds?
CAD filesA design engineer uses what can be downloaded straight away.Does the file download without emailing anyone?
Quote request carrying the part numberThey do not want to explain again what they were looking at.Send a request from a product page: is the part number in the email you receive?
Distributor by countryThey want someone nearby who speaks their language.Look for your distributor in Ireland: findable, and up to date?
Complete languagesA summary page is not enough to choose a product.Does the German version have as many product pages as the English one?
Proof for procurementProcurement checks accreditations and standing before approving a supplier.Dated certificates, downloadable, within two clicks?

Website, catalogue, portal: in what order?

Doing everything at once is the surest way to launch nothing. This is the order that holds up best, each stage resting on the one before:

  1. The audit. One to two weeks to find out what the site and the data are worth, and what to build first.
  2. The website redesign. Structure, company and range pages, request for quote, redirects from the old URLs.
  3. The product catalogue. One pilot family, then the others, synchronised from your data source.
  4. Languages. Once the catalogue is stable, each language is a translation job, not a new project.
  5. The customer portal. When customers and distributors want to track their orders and reorder online; a B2B ecommerce site if you also want new accounts.

Each stage has its own fixed price and you can stop after any of them. The website and the catalogue share the same data, so nothing is rebuilt when the portal arrives.

When a brochure site is enough

Not every manufacturer needs all of the above. A subcontract machinist working to drawing for a dozen customers has no catalogue to publish: those customers want to see the plant list, capabilities, accreditations and a contact. Five well-made pages with real photos of the shop floor do that job. A subscription website builder is enough, for a budget far below £8,000.

The website described on this page earns its cost in three cases:

  • You have your own products with part numbers.
  • You sell through distributors.
  • You export.

If none applies, keep the budget for something else, for example automating quote preparation.

We build websites and business tools. We do not do advertising, social media or branding: for those you need a marketing agency.

Frequently asked questions

How much does a manufacturing website cost?

From £8,000 ex VAT for a manufacturer’s website in one language, with a request for quote and an editing tool. The product catalogue is an optional module, from £7,000 ex VAT. The final price is fixed after the specification, before the build.

How long does it take?

Allow 6 to 10 weeks from the audit to launch. The full catalogue and the extra languages follow in stages, without holding up the launch.

Can you pull our catalogue from the ERP?

Yes. The catalogue module reads a file export from the ERP; a link through its API or a connector is a further option. That can be done with Sage 200, Access Dimensions, Pegasus Opera, Odoo, SAP Business One or an in-house system. The audit first checks what the ERP can export.

Who writes the technical copy?

Your people supply the material: datasheets, specifications, application notes. We structure it and edit it, in English or French, and you approve it. Copy written from scratch is quoted separately, and so is translation into other languages.

Will the website bring us quote requests?

It will make them possible and measurable; we cannot promise how many. Each request carries the part number that was being viewed, so you can see which pages are working.

Who owns the website?

The code repository, the hosting and the domain name are opened in your name from day one, and rights in the code pass to you as each stage is paid. Hosting is in the European Union, or in the UK if you ask for it.

What happens after launch?

One month of fixes against the specification comes with the launch. From then on, maintenance starts at £390 ex VAT a month; you stop it by email, effective at the end of the current month.

Read next

Start with a fixed-price audit

In one to two weeks you know what to build, in what order and in what price range. The audit fee is deducted from the first project we build for you.

£1,650 ex VAT 1 to 2 weeks See a sample report